Mooring Arrangement Retrofit project

As of 1st of February 2021 all Capesize vessels calling Port Hedland, Australia should comply with the new requirements – to have one set of bitts and Panama lead/roller fairleads on the vessel’s aft deck at or near the centerline to be rated to a minimum of 120T safe working load (SWL).

According to that, we did a Mooring Arrangements Retrofit on two sister vessels Bulk Carriers. Part of our scope of work included:

  • Update of the Mooring Arrangement Equipment Plan;
  • Update of the General Arrangement Plan
  • FEM Report of reinforcement related to all modification work and Class approval;
  • Reinforcement under mooring fittings drawings including a summary of the new reinforcement and modification of the existing
  • Local strength Calculation Report for newly added/replaced mooring winches and additional mooring equipment foundations and related hull support

We completed the project with the help of Rhino, Ansys, and AutoCAD

Услуги

Корабно проектиране

Корабно проектиране

Интериорен Дизайн и 3D Визуализация

Интериорен Дизайн и 3D Визуализация

Индустриално Проектиране

Индустриално Проектиране

Специализирани Услуги

Специализирани Услуги