IHB Ship Design in numbers –  18 years of experience, 50 in-house engineers, 600+ completed projects

Port of Port Hedland requirements

You have a Capesize vessel and you have to call Port of Port Hedland after 1st of January 2021.
You don’t have a set of 120T SWL bitt and lead installed and you don’t meet these new PPA Port
Hedland requirements?
No worries – we will design it and will prepare all necessary documentation for approval,
fabrication and installation
IHB ShipDesign will:
• Evaluate your existing vessel’s Plans and Construction whether complies or not with Pilbara Ports
Authority (PPA) requirements for 120T SWL bitts and leads;
• Preparing all relevant structural calculations and technical documentation for PPA review and
Class and approval;
• Selecting with Owner new bitts and leads and issuing a complete set of deck supports pre-
fabrication and installation drawings.

Services

Ship Design

Ship Design

Interior Design and 3D Visualization

Interior Design and 3D Visualization

Industrial Design

Industrial Design

Custom Services

Custom Services