1. Main outline of the project
This project follows up the Basic, Detail and Electrical design for retrofit of “InTank” BWTS on board the Semi-Submersible Drilling Rig – Stena Don. We have completed more than 450 BWTS designs for all types of vessels but this one is entirely different.
General Informaton for Sten Don:
A new deckhouse placed on deck 9 (as shown in the pictures) will contain the chemical mixing tanks. There will be piping distribution lines from the deck house to the four dosing units in the pontoons.
A new deckhouse placed on deck 9 (as shown in the pictures) will contain the chemical mixing tanks. There will be piping distribution lines from the deck house to the four dosing units in the pontoons.